top of page

Cabinets are installed

  • Writer: Jeanne Marie
    Jeanne Marie
  • Jan 31, 2020
  • 1 min read

Updated: Feb 5, 2020

On Friday, January 31, the cabinets were installed and the water barrier was added to the shower. At this point, the room is ready for the tiling. They also laid the heated floor.


Yorumlar


©2018 by Hummel Adventures. Proudly created with Wix.com

bottom of page